We received a $366,000 TP recovery claim on this earthmoving equipment which had reportedly suffered a lightning strike event.
A thorough investigation can often uncover critical details that significantly affect the outcome of a claim.
This case study focuses on a claim involving a recently purchased Scania P400 Hook Lift Truck in Western Australia, valued at approximately $150,000.00.
We received a claim on this unit, where the preliminary repair cost submitted by the OEM supplier was over $100,000.00.
The insured was uncertain about the cause of the damage but suspected operator error, however the operator was no longer with the business. The insured had purchased the unit less than six months earlier.
A comprehensive inspection with an ARC Assessing Equipment Specialist
Following our comprehensive inspection and investigation of all aspects of the claim and damage, we provided evidence showing that the unit had sustained pre-existing damage prior to the insured's purchase.
This enabled the insured to reclaim their costs in full.
The outcome was a zero dollar cost to the insured and a zero dollar cost to the insurer with over $100,000.00 saved.
Have a look at our client testimonials and if you’re chasing wins and results like these for your clients, don’t hesitate to contact the team at ARC Assessing on 1300 280 141 or send us an email at claims@arcassessing.com.au.
We received a $366,000 TP recovery claim on this earthmoving equipment which had reportedly suffered a lightning strike event.
The repair estimate received with this lightning strike claim, due to a severe weather event, was just over $130,000.
We received a claim on this unit which had suffered an operator error event, resulting in impact damage to its cabin and boom.